Monday, 1 December 2014

Production Log- Week 8

This week we had to ensure that we worked together well to ensure that we would finish and perfect all the products on time for the deadline. We both helped each other but we took specific roles that played to our strengths of technical abilities. This meant that Bilal worked on the ansillary products and Kieran worked on the editting of the footage. However near the end of the lesson we would come back and discuss the progress and any changes that are necessary.

In the creation of the ansillary products bilal was introduced to a new programme he has not used before, Adobe Photoshop.


However when looking through a video tutorial he had got the hang of it and was able to edit the photographs and text well.






This is the video tutorial that Bilal looked at to gain an insight on how to sue photoshop.



Kieran progressed swiftly with the editing however he had started to slow down due to a heap of other work, which lead to other groups progressing quicker. As a partnership this stressed us out a bit but after a pep talk with our teacher we felt better and was back on track. We sped the process up yet still paid extra attention to detail to ensure a slick video.

No comments:

Post a Comment